Project: EaglesWing     -     Entry

Apr 20, 2024 2.2 R/H Fuel Tank Category: Fuel System
Added cork to the sides of the R/H fuel tank. Drilled a pilot hole for the fuel vent line and fuel sender wires. Drilled 6 pilot holes in the fuel fill tube finishing ring. The grommets edging won't work because it will hit the welds. Once installed I'll put some sealant around the tube to finish it.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.